23I00084 – FLOOD CONTROL: CONSTRUCTION – SLOPE PROTECTION USING STRUCTURAL MEASURES (E.G. REVETMENT, RETAINING STRUCTURES, WIRENET)

SIPAG – FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES – CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION, HERNANI, EASTERN SAMAR

DATE AWARDED: JUNE 29, 2023

CONTRACT EFFECTIVITY: JULY 12, 2023

DATE COMPLETED:

0 Comment